GEM-4C 558 -4%
GPT-61S 555 -3.8%
CL-SN55 553 -3.8%
CL-OP55 551 -4%
GPT-61TERR 547 -3.5%
GEM-4CM 546 -4%
CL-OP55EH 542 -3.9%
GPT-61SOLXH 541 -3.6%
GPT-61SOLH 527 -3.7%
CL-SN55XH 523 -3.5%
GEM-4CL 520 -3.9%
GPT-61TERRXH 507 -3.4%
CL-OP55H 506 -4%
GPT-61SOLM 500 -3.5%
KIMI-K31P 499 -3.5%
GEM-4AR 498 -3.9%
GPT-61TERRH 490 -3.2%
CL-OP55M 483 -3.6%
MUSE-WONDFUL 479 -3.8%
CL-SN55H 467 -3.3%
CL-HK55 463 -2.9%
GPT-61TERRM 462 -3.1%
GPT-6A 451 -4.7%
MUSE-WOND 451 -3.6%
CL-HK55XH 450 -3%
GPT-6ASTRXH 440 -4.8%
GROK-47 440 -3.1%
GROK-47H 438 -2.9%
GPT-6ASTRH 437 -4.8%
DSK-V-340615 436 -2.9%
QWEN-38X 428 -2.9%
GPT-61SOLL 423 -3.2%
GLM-53 420 -3%
MIMO-V26P 420 -2.6%
CL-HK55H 419 -2.8%
LING-31F1019 417 -2.6%
GEM-38F 416 -2.8%
GPT-6ASTRM 415 -4.6%
MMAX-M31F 414 -2.8%
GEM-38FM 412 -2.8%
GPT-61TERRNO 411 -2.8%
GROK-47L 410 -2.8%
DSK-V-3E48BD 410 -2.6%
GPT-6L 407 -2.6%
GLM-53F 407 -2.6%
STEP-5 405 -2.6%
CL-FABL51XH 403 -4.7%
GPT-61TERRL 403 -2.9%
MIMO-V26F 401 -2.4%
CL-FABL51 399 -4.5%
CL-SN55M 395 -2.9%
CL-OP55L 393 -3.4%
MIST-LARG4 390 -2.7%
CL-FABL51H 386 -4.5%
CL-HK55M 386 -2.3%
GPT-6LUNAXH 377 -2.6%
MUSE-SPAROPE 375 -2.6%
MIST-LARG4M 371 -2.4%
DSK-V4P 365 -2.4%
GPT-6LUNAH 365 -2.1%
GLM-53L 364 -2.4%
CL-SN55L 362 -2.7%
GEM-38FL 361 -2.4%
GPT-6ASTRL 359 -4.5%
CL-FABL51M 359 -4.5%
QWEN-827B 349 -2.2%
CL-HK55L 347 -2%
MMAX-M3 345 -2%
GPT-6LUNAM 344 -2.3%
DSK-V-02811D 344 -2%
K2-HORI375BA 342 -2%
REFL-BEAM 338 -2%
QWEN-827BM 332 -1.8%
CL-FABL51L 329 -4.4%
QWEN-827BL 320 -1.8%
NEMO-35SUPEV 313 -1.9%
INKL 295 -1.7%
NVID-NEMO3UL 295 -1.3%
GEM-35FLITE 295 -1.3%
GPT-6LUNAL 287 -1.4%
GPT-6LUNANON 286 -1%
NANB-333B 285 -2.7%
QWEN-827BNON 282 -1.4%
COMM-APLUS 266 -1.1%
MUSE-GLIM 263 -1.1%
NEMO-35LIGH 261 -0.8%
GRAN-428B 258 -0.8%
MIST-SMAL4 252 -0.4%
INKL-SM 235 -2.5%
GEMM-431B 225 —
GEMM-4E4B 225 —
GEMM-4E4BNON 225 —
LING-30TINY 225 —
MINI-33B 225 —
NORT-MCODE 225 —
NOVA-MICR 225 —
NVID--ADE3B4 225 —
QWEN-54B 225 —
QWEN-54BNONR 225 —
TINY-AYAGLOB 225 —
GEM-4C 558 -4%
GPT-61S 555 -3.8%
CL-SN55 553 -3.8%
CL-OP55 551 -4%
GPT-61TERR 547 -3.5%
GEM-4CM 546 -4%
CL-OP55EH 542 -3.9%
GPT-61SOLXH 541 -3.6%
GPT-61SOLH 527 -3.7%
CL-SN55XH 523 -3.5%
GEM-4CL 520 -3.9%
GPT-61TERRXH 507 -3.4%
CL-OP55H 506 -4%
GPT-61SOLM 500 -3.5%
KIMI-K31P 499 -3.5%
GEM-4AR 498 -3.9%
GPT-61TERRH 490 -3.2%
CL-OP55M 483 -3.6%
MUSE-WONDFUL 479 -3.8%
CL-SN55H 467 -3.3%
CL-HK55 463 -2.9%
GPT-61TERRM 462 -3.1%
GPT-6A 451 -4.7%
MUSE-WOND 451 -3.6%
CL-HK55XH 450 -3%
GPT-6ASTRXH 440 -4.8%
GROK-47 440 -3.1%
GROK-47H 438 -2.9%
GPT-6ASTRH 437 -4.8%
DSK-V-340615 436 -2.9%
QWEN-38X 428 -2.9%
GPT-61SOLL 423 -3.2%
GLM-53 420 -3%
MIMO-V26P 420 -2.6%
CL-HK55H 419 -2.8%
LING-31F1019 417 -2.6%
GEM-38F 416 -2.8%
GPT-6ASTRM 415 -4.6%
MMAX-M31F 414 -2.8%
GEM-38FM 412 -2.8%
GPT-61TERRNO 411 -2.8%
GROK-47L 410 -2.8%
DSK-V-3E48BD 410 -2.6%
GPT-6L 407 -2.6%
GLM-53F 407 -2.6%
STEP-5 405 -2.6%
CL-FABL51XH 403 -4.7%
GPT-61TERRL 403 -2.9%
MIMO-V26F 401 -2.4%
CL-FABL51 399 -4.5%
CL-SN55M 395 -2.9%
CL-OP55L 393 -3.4%
MIST-LARG4 390 -2.7%
CL-FABL51H 386 -4.5%
CL-HK55M 386 -2.3%
GPT-6LUNAXH 377 -2.6%
MUSE-SPAROPE 375 -2.6%
MIST-LARG4M 371 -2.4%
DSK-V4P 365 -2.4%
GPT-6LUNAH 365 -2.1%
GLM-53L 364 -2.4%
CL-SN55L 362 -2.7%
GEM-38FL 361 -2.4%
GPT-6ASTRL 359 -4.5%
CL-FABL51M 359 -4.5%
QWEN-827B 349 -2.2%
CL-HK55L 347 -2%
MMAX-M3 345 -2%
GPT-6LUNAM 344 -2.3%
DSK-V-02811D 344 -2%
K2-HORI375BA 342 -2%
REFL-BEAM 338 -2%
QWEN-827BM 332 -1.8%
CL-FABL51L 329 -4.4%
QWEN-827BL 320 -1.8%
NEMO-35SUPEV 313 -1.9%
INKL 295 -1.7%
NVID-NEMO3UL 295 -1.3%
GEM-35FLITE 295 -1.3%
GPT-6LUNAL 287 -1.4%
GPT-6LUNANON 286 -1%
NANB-333B 285 -2.7%
QWEN-827BNON 282 -1.4%
COMM-APLUS 266 -1.1%
MUSE-GLIM 263 -1.1%
NEMO-35LIGH 261 -0.8%
GRAN-428B 258 -0.8%
MIST-SMAL4 252 -0.4%
INKL-SM 235 -2.5%
GEMM-431B 225 —
GEMM-4E4B 225 —
GEMM-4E4BNON 225 —
LING-30TINY 225 —
MINI-33B 225 —
NORT-MCODE 225 —
NOVA-MICR 225 —
NVID--ADE3B4 225 —
QWEN-54B 225 —
QWEN-54BNONR 225 —
TINY-AYAGLOB 225 —

Delayed ticker data. Last calculated 5 Nov 2026, 11:04 pm Sydney time.

← Back to feed

Pure DC Breaks Ground on €7.5B Finland AI Campus — Phase 1 Fully Leased at 110MW

Pure DC, the pan-European hyperscale data center platform, is launching an AI campus in Seinäjoki, Finland with a headline figure that commands attention: over €7.5 billion in total investment potential across a 550MW+ build-out. Phase 1 is already contracted.

The company describes it as the largest-ever inward investment into Finland by a UK firm. The UK Secretary of State for Science, Peter Kyle, endorsed the announcement, citing it as evidence of British firms competing at scale in international AI infrastructure.

Phase 1: 110MW, €1.5B, Fully Leased

Phase 1 covers 110MW of AI campus capacity at an investment of over €1.5 billion. Pure DC says Phase 1 is fully leased, the substation for the first data hall is constructed and live, and all planning permissions and power requirements are secured. That is an unusually clean project status for a large European data center build — most comparable projects at this scale are announced before leasing is complete or power contracts signed.

Why Finland

Finland has become a default destination for European AI data center buildouts for three reasons: electricity pricing anchored to Nord Pool’s low-carbon hydro and nuclear mix, established land availability for large campuses outside urban centres, and a political environment that has moved aggressively to attract hyperscale investment. Seinäjoki, in western Finland, gives Pure DC room to expand from 110MW to 550MW+ without the permitting constraints that constrain southern European sites.

Scale in Context

A 550MW campus at full build-out puts this project in the same tier as the largest AI data center announcements from Meta (5GW Louisiana campus), Microsoft (Fairwater at 800G scale), and Google’s global build program — though the Pure DC figure represents total potential capacity rather than committed spend. The €7.5 billion ceiling is contingent on permissions and contracting through all phases.

Phase 1 at 110MW is comparable to Japan’s national AI factory built with NVIDIA (140MW). It is not a symbolic project.

European AI Infrastructure Context

The Pure DC announcement follows the EU’s Formal Tech Sovereignty Package — €200B in European data center investment, Chips Act 2.0, and €2B for open source. Large hyperscale builds in member states satisfy both domestic compute ambitions and international hyperscaler demand for European footprints with predictable regulatory environments.

For Pure DC specifically, the Finland campus extends a portfolio that already spans Europe and the Middle East. Building in Finland while phase 1 is fully contracted reduces speculative capital risk — the question is whether the demand pipeline supports the 440MW gap between phase 1 and the stated ceiling.

At 110MW operational, the campus is live infrastructure. At 550MW, it is a meaningful fraction of Europe’s sovereign AI compute build.